Six Weeks, Six Artifacts: A Schedule From Raw Data Pull to a Live Endpoint

An interviewer asks you to walk through your capstone "end to end." If your answer is "I downloaded a dataset, trained XGBoost, and got 0.93 AUC," the interview is effectively over: you described a homework assignment, not a system. End to end means you touched every stage a model passes through between a raw source and a decision — ingestion, a frozen dataset, a training pipeline, an evaluation against a baseline, a packaged artifact, a serving endpoint, and a signal that tells you the thing still works six weeks later.

Here is a six-week schedule that fits alongside a job. One artifact per week, one binary done-criterion.

Week Artifact The decision it forces Done when
1 Frozen data snapshot + problem statement prediction target, unit of prediction, metric set snapshot hashed; metrics written down before modeling
2 Baseline + first tracked run is the signal real above trivial? baseline logged with config, git SHA, data hash
3 Feature pipeline + first real model which features are legal at serving time? one command rebuilds the model from raw snapshot
4 Evaluation report with slices where does it fail, and for whom? slice table plus chosen operating threshold
5 Packaged model behind an endpoint can someone else call it? p99 latency measured under expected load
6 Monitoring, model card, rerun test does it stay correct after launch? clean clone reproduces the reported metrics

The ordering is the point: every milestone ends in an artifact another person can run. Each week is not a block of "keep experimenting." If week 3 closes and nobody can execute python -m src.train --config configs/v1.yaml and get a model file, the milestone failed regardless of what the loss curve shows.

Week 1 is where capstones die quietly. Pulling data means freezing it: write the raw files to storage, record row counts and a content hash, and never mutate them again. Everything downstream — experiments, dashboards, drift alarms — points at that hash. Skipping it is why you cannot later answer "which data produced this number?", and it destroys the ground truth you would need for Production Monitoring and Drift Detection after launch.

Week 2's baseline should be embarrassing on purpose: majority class, a hand-written heuristic rule, logistic regression on two features. The baseline converts every later number from a vanity figure into a comparison. Log the run — config, git SHA, data hash, metric — because an untracked run cannot be reconstructed in an interview three months later.

Weeks 3 and 4 hold the modeling, but the real deliverable of week 4 is the slice table: performance per segment, per device tier, per geography — not one headline. Choose the operating threshold in week 4 as well, because the endpoint you ship in week 5 must answer with something: labels or scores. A score with no threshold silently pushes the decision onto the caller, and nobody owns it.

Week 5 is where latency stops being theoretical. Wrap the model behind a small HTTP service, hit it with a script firing your expected QPS, and record p50 and p99. Those numbers feed directly into Serving Trade-offs: Latency and Cost: whether batching, quantization, or a bigger instance is even on the table.

Week 6 wires the alarms — prediction distribution, feature freshness, error rate — writes the model card from this topic's final chapter, and ends with the rerun test: a clean machine, one command, metrics landing inside your declared tolerance. That test is the difference between a project you demoed and a project you can defend.

Metrics First: Offline, Online, and Guardrails Agreed Before Any Modeling Code

Your demo lands with 0.94 AUC on a churn model whose positive class is 3%. An interviewer nods and asks the only question that matters: "What changed because of that number?" If you cannot answer, the interview exposes the most common capstone failure — metrics chosen after the model, chosen to describe it rather than to judge it.

Write down three kinds of metric before any modeling code exists, and make each one a decision rule.

Metric type The question it answers Churn example Failure mode it catches
Offline Does the model rank well on data it has not seen, cut in time order? PR-AUC 0.63 vs 0.31 baseline leakage, overfitting, weak signal
Online Did the model's output change a real outcome? 7-day retention of contacted users vs randomized holdout offline gains that never transfer
Guardrail What must not regress while we chase the first two? p99 ≤ 50 ms, ≤ 5,000 contacts/day, calibration error ≤ 0.03 serving harm hidden by the headline

Two details do most of the work. First, the split must be temporal. A random split on transaction data lets the model train on December and test on November, and any time-ordered phenomenon — seasonality, a pricing change, a user's own trajectory — leaks across the boundary. Hold out the last two weeks and refuse to look at them until week 4.

Second, the online metric needs an owner and a decision. "Retention" is not yet a metric until you name the experiment: randomize at the user level (session-level randomization contaminates the arms when one person returns twice), hold out a control group, and pre-commit to how long it runs. For scale, a two-proportion test detecting a 2% relative lift on a 30% base rate at 80% power needs roughly 90,000 users per arm (n ≈ 7.84 · 2p(1-p) / δ²) — that number tells you the experiment runs for two full weekly cycles, not two days.

Capacity turns the offline metric into a business one. Your campaign team can call 5,000 customers a day. Sort the scores, take the top 5,000, and report precision at 5,000 alongside recall: at precision 0.42 you catch 2,100 genuine churners, versus 150 for random selection at a 3% base rate — a 14× lift that an executive understands instantly, where "PR-AUC improved 0.06" does not.

Guardrails need numbers too, and they need them written before the run so nobody can renegotiate them afterward. A defensible set for this project: p99 latency ≤ 50 ms at expected QPS, no more than 5,000 outbound contacts per day, calibration error ≤ 0.03 on the operating slice, and daily prediction volume within ±10% of the trailing week. Every guardrail gets an alarm and an owner — a guardrail nobody is paged for is decoration. Note what is deliberately absent: "accuracy in production" cannot be a guardrail, because delayed churn labels make it unmeasurable for weeks; guardrails must be computable from serving-time signals alone, or they fail exactly when you need them.

Turn the whole set into pre-registered acceptance criteria in the README: ship if PR-AUC ≥ 0.55 against the 0.31 baseline, precision@5,000 ≥ 0.35, all guardrails green for seven days, and the online test shows non-inferior retention. Pre-registration is the honest alternative to moving goalposts: when the model misses, the criteria tell you which lever to pull instead of inviting you to select a friendlier metric after the fact.

Interviewers ask "how would you know your model worked?" more often as a metrics question than a modeling question. A strong answer walks the table out loud: this offline number is the proxy, that online number is the decision, these guardrails are what I refuse to break — and here is the baseline each one is measured against.

The Rerun Contract: Model Cards, Experiment Records, and Proving Your Numbers

A reviewer clones your capstone, runs the training script, and gets 0.81 where your README claims 0.93. Nothing in the repository says which of them is wrong. That is the failure this chapter removes, with two documents: a model card for humans and an experiment record for machines.

Symptom later Root cause Artifact that prevents it
Rerun scores 12 points lower upstream file changed after the reported run frozen snapshot with content hash
Rerun crashes on load unpinned dependencies drifted lockfile / pinned environment
Metrics jitter run to run unseeded shuffling, nondeterministic kernels seeds + declared tolerance
Nobody knows what the model does undocumented target and thresholds model card

The model card is a short structured document — a page, not a wiki. Interviewers ask "how do you document a model for handoff?" and the sections are the answer:

Section Question it answers
Intended use / out-of-scope When must this model NOT be used?
Data Source, snapshot hash, date range, label definition
Evaluation Offline metrics per slice, against baselines
Thresholds Operating point, who chose it, why
Limitations Known failure slices, drift sensitivity, fairness notes
Details Architecture, hyperparameters, code SHA, training cost

The experiment record is what makes those claims checkable. Log every run with the config, git SHA, and data hash attached:

import hashlib, subprocess, mlflow

data_sha = hashlib.sha256(open("data/train.parquet", "rb").read()).hexdigest()[:16]
mlflow.set_experiment("capstone-churn")
with mlflow.start_run():
    mlflow.set_tag("git_sha", subprocess.check_output(["git", "rev-parse", "HEAD"]).decode().strip())
    mlflow.log_param("data_sha256", data_sha)
    mlflow.log_param("seed", 42)
    mlflow.log_metric("pr_auc", 0.63)
    mlflow.log_metric("precision_at_5k", 0.42)
    mlflow.log_artifact("reports/slice_metrics.csv")

Then run the rerun contract once, yourself, before you publish: a clean environment, one command, and a result that lands inside the tolerance you print in the README — ideally a mean over three seeds rather than a single lucky number. Only after that do you connect the endpoint to the drift and latency alarms you designed in Production Monitoring and Drift Detection, so the card's "monitoring" row points at something real.

The run record itself is small — five fields, every time:

Field Example Why it exists
git_sha a1c9f3e which code produced the number
data_sha256 9f2a…c71 which rows produced the number
config + seed configs/v1.yaml, 42 which knobs produced the number
metrics + slices pr_auc 0.63, per-segment CSV what the number was
environment python 3.11, xgboost 2.0.3 what executed the code

With those fields, handoff conversations become concrete: the receiving engineer diffs two runs field by field and sees whether a metric move came from data, code, or configuration — the same three-way localization you will be asked to perform when an interviewer says "production accuracy dropped 6 points; investigate." The monitoring row of the card should name signals rather than the word "monitoring": input-distribution distance against the snapshot hash, prediction-volume and score-distribution alarms, calibration re-checked as delayed labels arrive, and latency and error budgets held as guardrails, each with a threshold and a destination — dashboard, pager, or retrain trigger.

A headline metric without a data hash and a code SHA is a rumor. The card plus the run record turns your capstone into a claim a stranger can verify in an afternoon — which is exactly the impression the capstone is meant to leave.

Quiz

1. Your capstone README claims 0.93 AUC, but a classmate reruns training from your repository and gets 0.81. Which missing artifact most directly explains a gap that large?

Question 1 options

2. You must name the online success metric for a churn model that triggers a retention offer. Which entry belongs in the online column?

Question 2 options

3. You finished week 4 with an evaluation report. What must it contain before you package the model in week 5?

Question 3 options

4. Which model card section answers "when should this model NOT be used"?

Question 4 options

Flashcards

Question

What three metric types must a capstone define before any modeling code, and what does each catch?

Answer

An offline proxy metric on a time-based split (catches weak signal and leakage), an online decision metric against a randomized holdout (catches gains that never transfer to outcomes), and guardrails such as p99 latency, daily contact volume, and calibration error (catches harm the headline metric hides). Each must be stated with its baseline and target.

Question

What makes a weekly capstone milestone "done"?

Answer

An artifact another person can run, checked against a binary criterion: a hashed data snapshot, a tracked baseline run, a one-command training pipeline, a slice report with a chosen threshold, a load-tested endpoint, and a clean-clone rerun that reproduces the reported metrics.

Question

What does a model card document, and how long should it be?

Answer

Intended use and out-of-scope use, data source and snapshot hash, evaluation metrics per slice against baselines, operating thresholds and their rationale, known limitations and drift sensitivity, and training details (architecture, hyperparameters, code SHA). One page — a structured handoff document, not a wiki.

Question

Why freeze and hash the raw data on day one instead of when you write the report?

Answer

Because every later artifact references that hash: experiment runs, dashboards, and drift alarms. Data mutated in place makes old numbers unreproducible and leaves drift detection with no fixed reference distribution to compare live traffic against.

Question

What is the rerun test, and what does it prove?

Answer

Run training in a clean environment with one documented command and check the metrics land inside a declared tolerance — ideally a mean over three seeds. It proves the reported numbers belong to the repository rather than to one machine, one afternoon, or one lucky seed.

Revision Notes

Key Takeaways

  • 1. Every week ends in an artifact another person can run; a milestone without a runnable artifact is just elapsed time
  • 2. Freeze and hash raw data on day one — the hash is what makes experiments, reports, and later drift detection reference the same rows
  • 3. Metrics come first: an offline proxy on a time-based split, an online metric tied to a decision and a control group, and guardrails you refuse to break
  • 4. The operating threshold is chosen in evaluation week, not invented by the caller of the endpoint
  • 5. A headline score without a data hash, code SHA, and tolerance is a rumor; the model card plus run record makes it a verifiable claim

Interview Tips

  • • "Walk me through your capstone end to end" — answer in milestone order (snapshot → baseline → pipeline → evaluation → endpoint → monitoring), naming the artifact each stage produced; stage-by-stage artifacts signal systems thinking over notebook work
  • • "How would you know your model worked?" — give the three-column answer: offline proxy with baseline, online metric with randomization unit and duration, guardrails with limits; then say what decision each one changes
  • • "How do you document a model for handoff?" — recite the model card sections, leading with intended use and out-of-scope use, and mention the data hash and code SHA recorded per run
  • • "Your rerun scores lower than your README. Why?" — walk the four causes (changed data, unpinned versions, missing seeds, leakage later removed) and name the artifact that prevents each; showing the failure taxonomy beats asserting you are careful

Cheat Sheet

End-to-End Capstone: Six-Week Schedule

Week Artifact Done criterion
1 Frozen snapshot + problem statement hash + row counts recorded; metrics written
2 Baseline + tracked run baseline logged with config, SHA, data hash
3 Feature pipeline + first model one command rebuilds model from raw snapshot
4 Evaluation with slices slice table + chosen threshold vs baseline
5 Endpoint under load p50/p99 measured at expected QPS
6 Monitoring + model card + rerun clean clone reproduces metrics within tolerance

Metric set (define before modeling):

Type Churn example Catches
Offline PR-AUC 0.63 vs 0.31 baseline, last-2-weeks holdout weak signal, leakage
Online 7-day retention, contacted vs holdout, user-level randomization gains that don't transfer
Guardrail p99 ≤ 50 ms · ≤ 5,000 contacts/day · ECE ≤ 0.03 serving harm

Model card sections: intended use / out-of-scope · data + snapshot hash · per-slice evaluation · thresholds and rationale · limitations & drift sensitivity · details (architecture, hyperparameters, code SHA).

Rerun contract:

python -m src.train --config configs/v1.yaml   # clean env, one command
# expect: pr_auc 0.871 ± 0.004 across 3 seeds

Continue Learning